Keeping the best traditions of steelmaking craft and professionalism, enriching them with up-to-date knowledge and technologies, we realize that investments into development and implementation of the most efficient world-class technologies in production and management are the main prerequisites for us to remain competitive and enhance shareholders’ value.

The projects presented below are the most significant the Group runs or has ever run. All the project differ by CAPEX, payback period and parameters. But all of them are united under a common objective – help the Company to advance and develop sustainably raising its efficiency and competitiveness.

COAL MINING – COKE PRODUCTION
 
Completed projects
Ongoing and future projects
  • Construction of coke crushing unit — Avdeyevka coke and chemicals plant
    Cokequality improvement.

  • Introduction of ACS systems in coal dressing process Avdeyevka coke and chemicals plant

    This willhelp to maintain the desired clean coal ash level to produce high quality coke.

  • Reconstruction of the first stage of benzene compartment — Avdeyevka coke and chemicals plant
    Increase in benzene yield. Reduction in air polluting emissions.

ORE MINING — IRON ORE RAW MATERIALS PRODUCTION
 
Completed projects
  • Reconstruction of sections No.11 and 12 of ore processing plant No.1 — Severniy GOK
    Increase in iron ore concentrate production by 750 thousand tonnes per year.

Ongoing and future projectss
  • Introduction of the 5th stage of magnetic separation — Severniy GOK
    Iron ore concentrate quality improvement (increase in Fe content up to 65.8%).

  • Reconstruction of ore processing plant — Severniy GOK
    Increase in iron ore concentrate production by 750 thousand tonnes per year. 

  • Modernisation of calcining units — Severniy GOK
    Increase in pellets production by 2.1 mmtpy.

  • Introduction of magnetic flotation separation at mining-processing plants of Metinvest
    Ability to produce iron ore concentrate with Fe content exceeding 68% — production of iron ore raw materials of world-class quality.
STEEL AND ROLLED PRODUCTS MANUFACTURING

Completed projects
  • Construction of Air separating unit — Yenakievo Steel
    Increase in BOF steel production. Reduction in costs, steel products quality improvement.

  • Blast furnace #2 reconstruction — Azovstal Iron and Steel Works
    Increase in pig iron production by 1.1 mmt per year.

  • Blast furnace #5 reconstruction -Yenakievo Steel
    Increase in pig iron production by 1.1 mmtpy.

  • Construction of a new producing line for LD SAW pipes manufacture — Khartsyzsk pipe plant
    Product mix expansion by manufacturing of single seam pipes, increase in production volumes by 35% - up to 700 thousand tonnes per year.

  • Construction of Air separating unit — Azovstal Iron and Steel Works
    Increase in BOF steel production by 1.5 mmt per year. Reduction in costs, steel products quality improvement.

Ongoing projects
  • Construction of the complex of secondary metallurgy in BOF plant — Azovstal Iron and Steel Works
    Construction of two ladle furnaces and vacuum degasser unit will help to produce steel with carbon content– 0.03-0.06 %,  sulphur – less than 0.003 %, silicon – less than 0.02 %,  hydrogen – 1.5-3,0 ppm, nitrogen – less than 0.005 %. This will also improve the quality of conticast slabs and flat rolled products and help to start producing slabs of IF-steels.
  • Construction of a new slab conticaster Azovstal Iron and Steel Works

    Increase in steel continuous casting capacities by 2 mmtpy.

Future projects
  • Total reconstruction of blast-furnace facilities at Group’s steelmaking enteprises
    Construction of five modern blast furnaces two of which will be built at Yeankievo Steel (BF #1 and 3) and the three at Azovstal Iron and Steel Works (BF’s # 1, 3 and 5).

  • Construction of the third BOF furnace with OHF plant to be taken out of service — Azovstal Iron and Steel Works
    Cease of operation of OHF plant – non efficient and outdated steelmaking process. Reaching 100% share of concast billet. Increase in BOF steel production volumes.
  • Construction of two new universal conticasters — Yenakievo Steel
    Reaching 100% share of concast billet. Quality improvement and increase in BOF steel production volumes.

  • Construction of a new universal structural mill Yenakievo Steel
    High value added product mix expansion.